ASOS works have been completed on the lower ground and sixth floors. The remainder of the lower ground (including a gym), ground, first and second floors (phased as occupied throughout) are to be completed in 2019.
ASOS works have been completed on the lower ground and sixth floors.
The remainder of the lower ground (including a gym), ground, first and second floors (phased as occupied throughout) are to be completed in 2019.